Hurricane Creek Basin

Drainage Master Plan Project

Master Schedule

A presentation of recommendations will be made to the public after possible solutions are presented to the City.

Estimated – Winter 2021

Progress Updates

Data Collection

Data Collection

  • Community Meetings: 2/25/20 and 2/27/20
  • Residents & Businesses – please take our survey.
  • Stream and rain gauges were installed on November 22nd, 2019 and removed June 10, 2020

Mapping

Field Survey

Complete
Final survey was completed in September 2021 and consisted of survey of select drainage structures and house finish floor elevations in areas requiring further evaluation.

Modeling

Model

Step 1 – Model construction began April 2020

Step 2 – Model Construction and calibration to the flow monitoring data complete and accepted by the City in July 2021.

Step 3 – Once accepted, the model was run to represent existing conditions for various wet weather events. The results were presented to the City in August 2021.

Step 4 – Based on the model results, several areas with the drainage basin were identified as requiring further evaluation. Additional survey data was captured in September 2021 and analysis is underway.

DOWNLOAD A COPY OF THE COMMUNITY MEETING PRESENTATION (Available first week of March 2020)

Contact

Diane Vesely
Project Manager
Buchart Horn, Inc.
3150 Lenox Park Blvd. Suite 300
Memphis, TN 38115
hurricanecreek@bucharthorn.com